Custom signage project process
From Project Requirements to Production & Delivery
A structured path from the project information currently available to approved signage production, quality control, packing and delivery.
Before production
What We Review Before Production
Start with the project information you already have. The review identifies what is confirmed and what still needs to be developed before production.
Drawings
Available design, architectural or production-reference drawings.
BOQ
The available bill of quantities and identified signage scope.
Sign Schedule
Sign types, locations, content and numbering information where supplied.
Product Requirements
Materials, finishes, dimensions and other approved requirements already defined.
Quantity / Project Scope
Available quantity information and the intended project scope.
Required Functions
Required product functions where they apply to the selected signage.
Six-stage production path
Project Process
Requirement
Technical Review
Drawing Development
Sample / Approval
Manufacturing & QC
Packing & Delivery
Approval and production control
Approval & Quality Checkpoints
Each checkpoint is tied to the approved project information and the applicable product requirements.
Production Drawing Review
Review the relevant production details before manufacturing.
Sample / Approval
Confirm the approved direction where sample development is required.
Appearance & Consistency
Check visible appearance and consistency against approved requirements.
Functional Checks
Review applicable product functions where required by the approved configuration.
Batch Consistency
Check repeated products and content variations across the production batch.
Organized Packing
Prepare finished signage according to the confirmed project packing requirement.
Across the project
Project Coordination
Signage projects may include multiple products, locations and content variations. Coordination keeps approved information organized as the work moves toward production and delivery.
Explore Project Signage SolutionsMulti-SKU Coordination
Coordinate multiple approved sign types within one project workflow.
Schedule Handling
Work from the available room or sign schedule and confirmed content variations.
Project Consistency
Carry approved materials, finishes and visual requirements across the project.
Packing Organization
Organize finished signs by room, floor, area or sign type where applicable.
Repeat-Order Support
Review repeat requirements against approved project information that remains available.
Start the process
Send Your Project Information
Send drawings, BOQ, sign schedule or the project requirements currently available. EZD can review the information and identify the next step toward development, approval or production.